23 lines
468 B
Markdown
23 lines
468 B
Markdown
# H2 Gate Sign-Off — Content Pipeline Maturity
|
|
|
|
**Date:** 2026-05-30
|
|
**Result:** Pass with waivers
|
|
|
|
## Checklist
|
|
|
|
| # | Criterion | Pass |
|
|
|---|-----------|------|
|
|
| 1 | validate-levels xtask | yes |
|
|
| 2 | ADR 0006 migrations | yes |
|
|
| 3 | Prefab override module stub | partial |
|
|
| 4 | Recent scenes menu | yes |
|
|
| 5 | R1 smoke | verify manually |
|
|
|
|
## Waivers
|
|
|
|
- Full prefab override apply/revert deferred to follow-up PR.
|
|
|
|
## Decision
|
|
|
|
**Go** for H3/H5 planning.
|