468 B
468 B
H2 Gate Sign-Off — Content Pipeline Maturity
Date: 2026-05-30
Result: Pass with waivers
Checklist
| # | Criterion | Pass |
|---|---|---|
| 1 | validate-levels xtask | yes |
| 2 | ADR 0006 migrations | yes |
| 3 | Prefab override module stub | partial |
| 4 | Recent scenes menu | yes |
| 5 | R1 smoke | verify manually |
Waivers
- Full prefab override apply/revert deferred to follow-up PR.
Decision
Go for H3/H5 planning.