Blacksite/.cursor/plans/production_readiness_acceptance_2026-07-12.plan.md

2.2 KiB

Production-Readiness Acceptance Gate

Active plan — desired scope and acceptance, not implementation truth. Current shipped behavior is indexed in the canonical documentation.

Working plan for Gitea issue #50. This gate is broader than the M7 feature list: it proves the complete daily authoring, content, recovery, performance, and release workflow against one exact release-candidate commit.

Status

Audit in progress. The versioned acceptance matrix exists, but no release candidate is nominated and the gate is not signed off. Packaged/release testing remains explicitly deferred until the project owner requests it again.

Sequence

  1. Keep one evidence matrix under docs/editor/evaluations/production-readiness/; historical H1-H6 notes remain context only.
  2. Close implementation blockers before nominating a candidate. Renderer foundation #51, terrain #22-#24, physics placement/diagnostics #25-#26, operator invariants #33, collaborative safety #49, Material Library/targeted drops #16/#18, and native-dialog responsiveness #52 are accepted and integrated.
  3. Complete the representative regression project, performance budgets, and first-hour workflow tracked by #32, #34, #35, and #36.
  4. Nominate one exact commit, validate it from a clean checkout, and record source/headless results.
  5. When packaged testing is re-enabled, run the candidate's package/build and packaged-runtime matrix without substituting older artifacts.
  6. Run the eight-hour soak and measured performance protocol, consolidate limitations by severity and workaround, and obtain independent first-hour/recovery sign-off.
  7. Post the signed Gitea milestone comment linking the exact commit and immutable evidence. Close #50 only when every required row passes and no P0 blocker remains.

Gate Rules

  • Feature presence is not acceptance evidence.
  • A local dirty worktree is not a release candidate.
  • Results from another commit or an old package do not transfer to the candidate.
  • Deferred, missing, partial, and implementer-only evidence are not passes.
  • Every failure records an owner ticket or a concrete rerun condition.