Commit Graph
12 Commits
Author SHA1 Message Date
Rbanh 0e7aed40f1 Add transactional physics placement
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 22:07:17 -04:00
Rbanh d1a56f77cc Add terrain material layer painting
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 21:00:13 -04:00
Rbanh 293811aecd Add terrain sculpt stroke tools
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 19:50:47 -04:00
Rbanh ed21bcc52d Add chunked terrain authoring foundation
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 18:43:42 -04:00
Rbanh 577d8dcb27 Refresh production readiness matrix
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 18:10:03 -04:00
Rbanh ba59f57a5a Finish non-blocking native dialog workflows
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 18:06:57 -04:00
Rbanh 61be2440bd Document collaborative file safety acceptance
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 17:43:07 -04:00
Rbanh 3794faa4aa Document material workflow acceptance
CI / Format, lint, test, build (push) Waiting to run
2026-07-12 13:18:40 -04:00
Rbanh f2ad88fd03 Define production readiness acceptance gate 2026-07-12 11:29:17 -04:00
Rbanh b4aa61e394 Ship production navigation authoring workflow 2026-07-12 02:53:43 -04:00
Rbanh 0798aa5d57 Build renderer and material component foundations
Add dedicated skinned rendering, pose restoration, shared Material and Material Instance slots, registry-driven components, Surface/Solari integration, transactional schema upgrades, navigation authoring, documentation, and evaluation evidence.
2026-07-12 00:24:06 -04:00
Rbanh f29712d158 Initial project import
CI / Format, lint, test, build (push) Waiting to run
2026-06-05 21:44:45 -04:00